anx_II__para_2__continuation__7
2.1.4. Before the tests in 2.2 and 2.3 are carried out, a sufficient number of prepackages shall be drawn at random from the batch so that the check requiring the larger sample can be carried out.
← anx_II__para_2__continuation__6 · All articles · anx_II__para_2__continuation__8 →
Source: EUR-Lex (Cellar) · retrieved 2026-11-10 · Text as adopted (Official Journal); later amendments are not incorporated in this text.