6.4.
An emergency plan for sea rescue and workplace evacuation situations must be drawn up. The plan, which must be based on the safety and health document referred to in point 1.1, must provide for the use of standby vessels and helicopters and include criteria concerning the capacity and response time of standby vessels and helicopters. The required response time must be given in the safety and health document for each installation. Standby vessels must be designed and equipped to meet evacuation and rescue requirements.