lexiara

ANNEX VI

INTERNAL PRODUCTION CONTROL PLUS TESTS (module Aa, option 1) This module consists of module A, as referred to in Annex V, plus the following supplementary requirements: On one or several boats representing the production of the manufacturer one or more of the following tests, equivalent calculation or control shall be carried out by the manufacturer or on his behalf: These tests or calculations or control shall be carried out on the responsibility of a notified body chosen by the manufacturer. On the responsibility of the notified body, the manufacturer shall affix the former's distinguishing number during the manufacturing process. test of stability according to point 3.2 of the Essential Requirements, test of buoyancy characteristics according to point 3.3 of the Essential Requirements Provisions common to both variations

· All articles ·

Source: EUR-Lex (Cellar) · retrieved 2026-11-02 · Text as adopted (Official Journal); later amendments are not incorporated in this text.