Article 18
1. In order to draw up the EC declaration of verification, the awarding authority or its official representative shall cause the EC checking procedure to be appraised by the notified body chosen by it for that purpose. 2. The activities of the notified body responsible for the EC verification of a subsystem shall begin at the design stage and shall cover all of the manufacturing period up to the type-approval stage before a subsystem is placed in service. 3. The notified body shall be responsible for compiling the technical file that has to accompany the EC declaration of verification. The technical file must contain all the necessary documents relating to the characteristics of the subsystem and, where appropriate, all the documents certifying conformity of the constituents of interoperability. It must also contain all of the elements relating to the conditions and limits of use and to the instructions concerning servicing, constant or routine monitoring, adjustment and maintenance.
← art_17__para · All articles · 1. →
Source: EUR-Lex (Cellar) · retrieved 2026-10-29 · Text as adopted (Official Journal); later amendments are not incorporated in this text.