lexiara

preamble_4515

6.4.22.4. Each package design for fissile material which is not excepted according to 6.4.11.2 from the requirements that apply specifically to packages containing fissile material shall require multilateral approval.

· All articles ·

Source: EUR-Lex (Cellar) · retrieved 2026-10-31 · Text as adopted (Official Journal); later amendments are not incorporated in this text.