lexiara

preamble_4921

(a) The IBC shall be placed on its base on level hard ground and subjected to a uniformly distributed superimposed test load (see 6.5.4.6.4). IBCs shall be subjected to the test load for a period of at least:

· All articles ·

Source: EUR-Lex (Cellar) · retrieved 2026-10-31 · Text as adopted (Official Journal); later amendments are not incorporated in this text.