lexiara

preamble_6062

The hydraulic pressure test shall be carried out before the installation of such thermal equipment as may be necessary. If the shells and their equipment are tested separately, they shall be jointly subjected to a leakproofness test in accordance with 6.8.2.4.3.

· All articles ·

Source: EUR-Lex (Cellar) · retrieved 2026-10-31 · Text as adopted (Official Journal); later amendments are not incorporated in this text.