lexiara

preamble_6162

6.8.3.4.3. The first hydraulic pressure test shall be carried out before thermal insulation is placed in position.

· All articles ·

Source: EUR-Lex (Cellar) · retrieved 2026-10-31 · Text as adopted (Official Journal); later amendments are not incorporated in this text.