Article 6
1. Where they opt for the tendering procedure, Member States or any competent body designated by the Member State concerned shall draw up an inventory of new means of production, including replacement capacity, on the basis of the regular estimate referred to in paragraph 2. The inventory shall take account of the need for interconnection of systems. The requisite capacity shall be allocated by means of a tendering procedure in accordance with the procedure laid down in this Article. 2. The transmission system operator or any other competent authority designated by the Member State concerned shall draw up and publish under State supervision, at least every two years, a regular estimate of the generating and transmission capacity which is likely to be connected to the system, of the need for interconnectors with other systems, of potential transmission capacity and of the demand for electricity. The estimate shall cover a period defined by each Member State. 3. Details of the tendering procedure for means of production shall be published in the Official Journal of the European Communities at least six months prior to the closing date for tenders. The tender specifications shall be made available to any interested undertaking established in the territory of a Member State so that it has sufficient time in which to submit a tender. The tender specifications shall contain a detailed description of the contract specifications and of the procedure to be followed by all tenderers and an exhaustive list of criteria governing the selection of tenderers and the award of the contract. These specifications may also relate to the fields referred to in Articles 5 (1). 4. In invitations to tender for the requisite generating capacity, consideration must also be given to electricity supply offers with long-term guarantees from existing generating units, provided that additional requirements can be met in this way. 5. Member States shall designate an authority or a public body or a private body independent of electricity generation, transmission and distribution activities to be responsible for the organization, monitoring and control of the tendering procedure. This authority or body shall take all necessary steps to ensure confidentiality of the information contained in the tenders. 6. However, it must be possible for autoproducers and independent producers to obtain authorization, on the basis of objective, transparent and non-discriminatory criteria as laid down in Articles 4 and 5, in Member States which have opted for the tendering procedure. CHAPTER IV Transmission system operation
← (3) · All articles · (1) →
Source: EUR-Lex (Cellar) · retrieved 2026-10-31 · Text as adopted (Official Journal); later amendments are not incorporated in this text.