Article 8
1. The transmission system operator shall be responsible for dispatching the generating installations in its area and for determining the use of interconnectors with other systems. 2. Without prejudice to the supply of electricity on the basis of contractual obligations, including those which derive from the tendering specifications, the dispatching of generating installations and the use of interconnectors shall be determined on the basis of criteria which may be approved by the Member State and which must be objective, published and applied in a non-discriminatory manner which ensures the proper functioning of the internal market in electricity. They shall take into account the economic precedence of electricity from available generating installations of interconnector transfers and the technical constraints on the system. 3. A Member State may require the system operator, when dispatching generating installations, to give priority to generating installations using renewable energy sources or waste or producing combined heat and power. 4. A Member State may, for reasons of security of supply, direct that priority be given to the dispatch of generating installations using indigenous primary energy fuel sources, to an extent not exceeding in any calendar year 15 % of the overall primary energy necessary to produce the electricity consumed in the Member State concerned.
← (6) · All articles · (1) →
Source: EUR-Lex (Cellar) · retrieved 2026-10-31 · Text as adopted (Official Journal); later amendments are not incorporated in this text.