ANNEX III
CONTROL AND MONITORING PROCEDURES IN OPERATION AND AFTER-CARE PHASES 1. Introduction The purpose of this Annex is to provide the minimum procedures for monitoring to be carried out to check: that waste has been accepted to disposal in accordance with the criteria set for the category of landfill in question, that the processes within the landfill proceed as desired, that the environmental protection systems are functioning fully as intended, that the permit conditions for the landfill are fulfilled. 2. Meteorological data Under their reporting obligation (Article 15), Member States should supply data on the collection method for meteorological data. It us up to Member States to decide how the data should be collected (in situ, national meteorological network, etc.). Should Member States decide that water balances are an effective tool for evaluating whether leachate is building up in the landfill body or whether the site is leaking, it is recommended that the following data are collected from monitoring at the landfill or from the nearest meteorological station, as long as required by the competent authority in accordance with Article 13(c) of this Directive: >TABLE> 3. Emission data: water, leachate and gas control Sampling of leachate and surface water if present must be collected at representative points. Sampling and measuring (volume and composition) of leachate must be performed separately at each point at which leachate is discharged from the site. Reference: general guidelines on sampling technology, ISO 5667-2 (1991). Monitoring of surface water is present shall be carried out at not less than two points, one upstream from the landfill and one downstream. Gas monitoring must be representative for each section of the landfill. The frequency of sampling and analysis is listed in the following table. For leachate and water, a sample, representative of the average composition, shall be taken for monitoring. The frequency of sampling could be adapted on the basis of the morphology of the landfill waste (in tumulus, buried, etc). This has to be specified in the permit. >TABLE> 4. Protection of groundwater Sampling The measurements must be such as to provide information on groundwater likely to be affected by the discharging of waste, with at least one measuring point in the groundwater inflow region and two in the outflow region. This number can be increased on the basis of a specific hydrogeological survey and the need for an early identification of accidental leachate release in the groundwater. Sampling must be carried out in at least three locations before the filling operations in order to establish reference values for future sampling. Reference: Sampling Groundwaters, ISO 5667, Part 11, 1993. Monitoring The parameters to be analysed in the samples taken must be derived from the expected composition of the leachate and the groundwater quality in the area. In selecting the parameters for analysis account should be taken of mobility in the groundwater zone. Parameters could include indicator parameters in order to ensure an early recognition of change in water quality(1). >TABLE> Trigger levels Significant adverse environmental effects, as referred to in Articles 12 and 13 of this Directive, should be considered to have occurred in the case of groundwater, when an analysis of a groundwater sample shows a significant change in water quality. A trigger level must be determined taking account of the specific hydrogeological formations in the location of the landfill and groundwater quality. The trigger level must be laid down in the permit whenever possible. The observations must be evaluated by means of control charts with established control rules and levels for each downgradient well. The control levels must be determined from local variations in groundwater quality. 5. Topography of the site: data on the landfill body >TABLE>
← 5. · All articles · anx_III__para →
Source: EUR-Lex (Cellar) · retrieved 2026-10-29 · Text as adopted (Official Journal); later amendments are not incorporated in this text.