Article 4 › 4
►M6 The time limits laid down in paragraph 1 may be extended for the purposes of phased achievement of the objectives for bodies of water, provided that no further deterioration occurs in the status of the affected body of water when all the following conditions are met: ◄ (a) Member States determine that all necessary improvements in the status of bodies of water cannot reasonably be achieved within the timescales set out in that paragraph for at least one of the following reasons: (i) the scale of improvements required can only be achieved in phases exceeding the timescale, for reasons of technical feasibility; (ii) completing the improvements within the timescale would be disproportionately expensive; (iii) natural conditions do not allow timely improvement in the status of the body of water. (b) Extension of the deadline, and the reasons for it, are specifically set out and explained in the river basin management plan required under Article 13. (c) Extensions shall be limited to a maximum of two further updates of the river basin management plan except in cases where the natural conditions are such that the objectives cannot be achieved within this period. (d) A summary of the measures required under Article 11 which are envisaged as necessary to bring the bodies of water progressively to the required status by the extended deadline, the reasons for any significant delay in making these measures operational, and the expected timetable for their implementation are set out in the river basin management plan. A review of the implementation of these measures and a summary of any additional measures shall be included in updates of the river basin management plan.
← 3 · All articles · 5 →
Source: EUR-Lex CELLAR · retrieved 2026-08-09