Article 29
Special measures to be taken in the event of disturbance 1. In the event of disturbance to train movements caused by technical failure or accident the infrastructure manager must take all necessary steps to restore the normal situation. To that end he shall draw up a contingency plan listing the various public bodies to be informed in the event of serious incidents or serious disturbance to train movements. 2. In an emergency and where absolutely necessary on account of a breakdown making the infrastructure temporarily unusable, the paths allocated may be withdrawn without warning for as long as is necessary to repair the system. The infrastructure manager may, if he deems it necessary, require railway undertakings to make available to him the resources which he feels are the most appropriate to restore the normal situation as soon as possible. 3. Member States may require railway undertakings to be involved in assuring the enforcement and monitoring of their own compliance of the safety standards and rules. CHAPTER IV GENERAL MEASURES
← 2. · All articles · art_29__para →
Source: EUR-Lex (Cellar) · retrieved 2026-10-29 · Text as adopted (Official Journal); later amendments are not incorporated in this text.