Article 18
In order to establish the ‘EC’ declaration of verification, the procurement entity or its official representative shall invite the notified body that it has selected for that purpose to apply the ‘EC’ verification procedure referred to in Annex VI. The task of the notified body responsible for the ‘EC’ verification of a subsystem shall begin at the design stage and cover the entire manufacturing period through to the acceptance stage before the subsystem is put into service. It shall also cover verification of the interfaces of the subsystem in question with the system into which it is incorporated, based on the information available in the relevant TSI and in the registers provided for in Article 24. The notified body shall be responsible for compiling the technical file that has to accompany the ‘EC’ declaration of verification. This technical file must contain all the necessary documents relating to the characteristics of the subsystem and, where appropriate, all the documents certifying conformity of the interoperability constituents. It should also contain all the elements relating to the conditions and limits of use and to the instructions concerning servicing, constant or routine monitoring, adjustment and maintenance.
← art_17__text_1 · All articles · 1. →
Source: EUR-Lex (Cellar) · retrieved 2026-10-29 · Text as adopted (Official Journal); later amendments are not incorporated in this text.