Article 23
The order of priority for the adoption of the TSIs shall be as follows, without prejudice to the order of adoption of the mandates provided for in Article 6(1): the first group of TSIs will cover control/command and signalling; telematic applications for freight services; traffic operation and management (including staff qualifications for cross-border services respecting the criteria defined in Annexes II and III); freight wagons; noise problems deriving from rolling stock and infrastructure. As regards rolling stock, that intended for international use will be developed first; the following aspects shall also be discussed in the light of the resources of the Commission and the joint representative body: telematic applications for passenger services, maintenance, with particular regard to safety, passenger carriages, traction units and locomotives, infrastructure, energy and air pollution. As regards rolling stock, that intended for international use will be developed first; at the request of the Commission, a Member State or the joint representative body, the Committee may decide, according to the procedure laid down in Article 21(2), to draw up a TSI for an additional subject without prejudicing the order of priorities set out above in so far as it concerns a subsystem mentioned in Annex II. The Committee, following the procedure laid down in Article 21(2), shall draw up a work programme observing the order of priority referred to in paragraph 1 and that of the other tasks entrusted to it by this Directive. The TSIs mentioned in the first work programme referred to in paragraph 1(a) shall be drawn up not later than 20 April 2004. The work programme shall consist of the following stages: designation of the joint representative body; development on the basis of a draft established by the joint representative body of a representative architecture of the conventional rail system, based on the list of subsystems (Annex II), to guarantee consistency between TSIs. This architecture must include in particular the different constituents of this system and their interfaces and act as a reference framework for defining the areas of use of each TSI; adoption of a model structure for developing TSIs; adoption of a method of cost-benefit analysis of the solutions set out in the TSIs; adoption of the mandates needed to draw up the TSIs; adoption of the basic parameters for each TSI; approval of draft standardisation programmes; management of the transition period between the date of entry into force of this Directive and publication of the TSIs, including the adoption of the reference system mentioned in Article 25.
← art_22__text_1 · All articles · 1. →
Source: EUR-Lex (Cellar) · retrieved 2026-10-29 · Text as adopted (Official Journal); later amendments are not incorporated in this text.