art_7__point_b__text_1
for any project concerning the renewal or upgrading of an existing line where the loading gauge, track gauge, space between the tracks, or electrification voltage in these TSIs is not compatible with those of the existing line;
← (b) · All articles · (c) →
Source: EUR-Lex (Cellar) · retrieved 2026-10-29 · Text as adopted (Official Journal); later amendments are not incorporated in this text.