lexiara

rec_29

(29) The subsystems constituting the trans-European conventional rail system should be subjected to a verification procedure. This verification must enable the authorities responsible for authorising their putting into service to be certain that, at the design, construction and putting into service stages, the result is in line with the regulations and technical and operational provisions in force. It must also enable manufacturers to be able to count upon equality of treatment whatever the country. It is therefore necessary to lay down a module defining the principles and conditions applying to ‘EC’ verification of subsystems.

· All articles ·

Source: EUR-Lex (Cellar) · retrieved 2026-10-29 · Text as adopted (Official Journal); later amendments are not incorporated in this text.