3.
(a) The regulatory authority referred to in Article 25 may, on a case by case basis, decide on the exemption referred to in paragraphs 1 and 2. However, Member States may provide that the regulatory authorities shall submit, for formal decision, to the relevant body in the Member State its opinion on the request for an exemption. This opinion shall be published together with the decision. (i) The exemption may cover all or parts of, respectively, the new infrastructure, the existing infrastructure with significantly increased capacity or the modification of the existing infrastructure. In deciding to grant an exemption consideration shall be given, on a case by case basis, to the need to impose conditions regarding the duration of the exemption and non-discriminatory access to the interconnector. When deciding on the conditions in this subparagraph account shall, in particular, be taken of the duration of contracts, additional capacity to be built or the modification of existing capacity, the time horizon of the project and national circumstances. When granting an exemption the relevant authority may decide upon the rules and mechanisms for management and allocation of capacity insofar as this does not prevent the implementation of long term contracts. The exemption decision, including any conditions referred to in (b), shall be duly reasoned and published. In the case of an interconnector any exemption decision shall be taken after consultation with the other Member States or regulatory authorities concerned.
← 2. · All articles · (b) →
Source: EUR-Lex (Cellar) · retrieved 2026-10-29 · Text as adopted (Official Journal); later amendments are not incorporated in this text.