General
Congestion management method(s) implemented by Member States shall deal with short-run congestion in a market-based, economically efficient manner whilst simultaneously providing signals or incentives for efficient network and generation investment in the right locations. The TSOs, or, where appropriate, Member States, shall provide non-discriminatory and transparent standards, which describe which congestion management methods they will apply under which circumstances. These standards, together with the security standards, shall be described in publicly available documents. Different treatment of the different types of cross-border transactions, whether they are physical bilateral contracts or bids into foreign organised markets, shall be kept to a minimum when designing the rules of specific methods for congestion management. The method for allocating scarce transmission capacity must be transparent. Any differences in how transactions are treated must be shown not to distort or hinder the development of competition. Price signals that result from congestion management systems shall be directional. TSOs shall offer to the market transmission capacity that is as ‘firm’ as possible. A reasonable fraction of the capacity may be offered to the market under the condition of decreased firmness, but at all times the exact conditions for transport over cross border lines shall be made known to market participants. Considering the fact that the European continental network is a highly meshed network and that the use of interconnection lines has an effect on the power flows on at least two sides of a national border, national Regulators shall ensure that no congestion management procedure with significant effects on power flows in other networks, is devised unilaterally.
← ANNEX · All articles · 1. →
Source: EUR-Lex (Cellar) · retrieved 2026-11-01 · Text as adopted (Official Journal); later amendments are not incorporated in this text.