(b)
The exemption may cover all or part of the capacity of the new interconnector, or of the existing interconnector with significantly increased capacity. In deciding to grant an exemption, consideration shall be given, on a case by case basis, to the need to impose conditions regarding the duration of the exemption and non discriminatory access to the interconnector. When deciding on the conditions in (i) and (ii) account shall, in particular, be taken of the additional capacity to be built, the expected time horizon of the project and national circumstances.
← art_7__para_4__point_a__text_1 · All articles · (i) →
Source: EUR-Lex (Cellar) · retrieved 2026-11-01 · Text as adopted (Official Journal); later amendments are not incorporated in this text.