anx_IV__para__55
3.6.3. For strategies requiring more than a preconditioning cycle for MI activation, the manufacturer must provide data and/or an engineering evaluation which adequately demonstrates that the monitoring system is equally effective and timely in detecting component deterioration. Strategies requiring on average more than ten OBD or emission test cycles for MI activation are not accepted.
← anx_IV__para__54 · All articles · anx_IV__para__56 →
Source: EUR-Lex (Cellar) · retrieved 2026-11-10 · Text as adopted (Official Journal); later amendments are not incorporated in this text.