(1)
At all relevant points, transmission system operators shall publish the following information about the capacity situation down to daily periods on the Internet on a regular/rolling basis and in a user‐friendly standardised manner: the maximum technical capacity for flows in both directions, the total contracted and interruptible capacity, the available capacity.
← 3.3. Information to be published at all relevant points and the time schedule according to which this information should be published · All articles · anx_ANNEX__cpt_3__cpt_3__point_1__text_1 →
Source: EUR-Lex (Cellar) · retrieved 2026-11-21 · Text as adopted (Official Journal); later amendments are not incorporated in this text.