lexiara

3. Developing electrical connections within the Member States

Connections on the Danish east-west axis: connection between Denmark's western (UCTE) and eastern (NORDEL) networks Connection on the Danish north-south axis New connections in northern France New connections in south-western France Trino Vercellese (IT) — Lacchiarella (IT) line Turbigo (IT) — Rho (IT) — Bovisio (IT) line Voghera (IT) — La Casella (IT) line S. Fiorano (IT) — Nave (IT) — Gorlago (IT) line Venezia Nord (IT) — Cordignano (IT) line Redipuglia (IT) — Udine Ovest (IT) line New connections on the east-west axis of Italy Tavarnuzze (IT) — Casallina (IT) line Tavarnuzze (IT) — S.Barbara (IT) line Rizziconi (IT) — Feroleto (IT) — Laino (IT) line New connections on the north-south axis of Italy Network modifications for facilitating renewables connections in Italy New wind energy connections in Italy New connections on the north axis of Spain New connections on the Mediterranean axis of Spain New connections on the Galicia (ES) — Centro (ES) axis New connections on the Centro (ES) — Aragón (ES) axis New connections on the Aragón (ES) — Levante (ES) axis New connections on the Spanish south-centre axis (ES) New connections on the Spanish east-centre axis (ES) New connections in Andalucía (ES) Pedralva (PT) — Riba d'Ave (PT) line and Pedralva facilities Recarei (PT) — Valdigem (PT) line Picote (PT) — Pocinho (PT) line (upgrading) Modification of the current Pego (PT) — Cedillo (ES)/Falagueira (PT) line and Falagueira facilities Pego (PT) — Batalha (PT) line and Batalha facilities Sines (PT) — Ferreira do Alentejo (PT) I line (upgrading) New wind energy connections in Portugal Pereiros (PT) — Zêzere (PT) — Santarém (PT) lines and Zêzere facilities Batalha (PT) — Rio Maior (PT) I and II lines (upgradings) Carrapatelo (PT) — Mourisca (PT) line (upgrading) Valdigem (PT) — Viseu (PT) — Anadia (PT) line Deviation of the current Rio Maior (PT) — Palmela (PT) line to Ribatejo (PT) and Ribatejo facilities Thessaloniki (EL), Lamia (EL) and Patras (EL) substations and connecting lines Connections of the regions of Evia (EL), Lakonia (EL) and Thrace (EL) Strengthening of existing connections of peripheral regions in the mainland in Greece Tynagh (IE) — Cashla (IE) line Flagford (IE) — East Sligo (IE) line Connections in the north-east and west of Spain, in particular to connect to the network wind-power generation capacities Connections in the Basque country (ES), Aragón (ES) and Navarra (ES) Connections in Galicia (ES) Connections in central Sweden Connections in southern Sweden Hamburg (DE) — Schwerin region (DE) line Halle/Saale region (DE) — Schweinfurt region (DE) line New wind energy connections off-and onshore in Germany Upgrading of 380 kV grid in Germany for connection of offshore windmill parks Connections in Northern Ireland, in relation to the interconnections with Ireland Connections in the north-west of the United Kingdom Connections in Scotland and England, with a view to the greater use of renewable sources in electricity generation New offshore wind energy connections in Belgium, including upgrade of 380 kV grid Borssele substation (NL) Implementation of reactive power compensation equipment (NL) Installation of phase shifters and/or capacitor batteries in Belgium Upgrading of 380 kV grid in Belgium to increase import capacity St. Peter (AT) — Tauern (AT) line Süd-Burgenland (AT) — Kainachtal (AT) line Dunowo (PL) — Żydowo (PL) – Krzewina (PL) – Plewiska (PL) Pątnów (PL) — Grudziądz (PL) Ostrów (PL) — Plewiska (PL) Ostrów (PL) — Trębaczew (Rogowiec) (PL) Plewiska (PL) — Pątnów (PL) Tarnów (PL) — Krosno (PL) Ełk (PL) — Olsztyn Matki (PL) Ełk (PL) — Narew (PL) Mikułowa (PL) — Świebodzice — Dobrzeń (Groszowice) (PL) Pątnów (PL) — Sochaczew (PL) — Warszawa (PL) Krsko (SI) — Bericevo (SI) Upgrade of Slovene transmission system from 220 kV to 400 kV Medzibrod (SK) — Liptovská Mara (SK) Lemešany (SK) — Moldava (SK) Lemešany (SK) — Veľký Kapušany (SK) Gabčíkovo (SK) — Veľký Ďur (SK) Connections in northern Sweden Transferring Saaremaa (EE) supply to 110 kV Improving Tartu (EE) power supply Renovation of Eesti (EE) substation (330 kV) Renovation of Kiisa (EE), Püssi (EE), and Viljandi (EE) substations (110 kV) Nošovice (CZ) — Prosenice (CZ): rebuilding of 400 kV single line as 400 kV double-circuit line Krasíkov (CZ) — Horní Životice (CZ): new 400 kV single line New wind energy connections in Malta (MT)

· All articles ·

Source: EUR-Lex (Cellar) · retrieved 2026-11-01 · Text as adopted (Official Journal); later amendments are not incorporated in this text.