lexiara

5.

When placing extractive waste back into excavation voids, whether created through surface or underground extraction, which will be allowed to flood after closure, the operator shall take the necessary measures to prevent or minimise water status deterioration and soil pollution in accordance, mutatis mutandis, with paragraphs (1) and (3).The operator shall provide the competent authority with the information necessary to ensure compliance with Community obligations, in particular those in Directive 2000/60/EC.

· All articles ·

Source: EUR-Lex (Cellar) · retrieved 2026-10-12 · Text as adopted (Official Journal); later amendments are not incorporated in this text.