lexiara

anx_IV__cpt_1__cpt_1__cpt_2__text_2

In developing the top-down calculation method used in this harmonised calculation model, the Committee shall base its work, to the extent possible, on existing methodologies such as the ODEX model ODYSSEE-MURE Project, SAVE Programme. Commission 2005. .

· All articles ·

Source: EUR-Lex (Cellar) · retrieved 2026-10-29 · Text as adopted (Official Journal); later amendments are not incorporated in this text.