ANNEX VI
Without prejudice to national and Community public procurement legislation, Member States shall ensure that the public sector applies at least two requirements from the following list in the context of the exemplary role of the public sector as referred to in Article 5: requirements concerning the use of financial instruments for energy savings, including energy performance contracting, that stipulate the delivery of measurable and pre-determined energy savings (including whenever public administrations have outsourced responsibilities); requirements to purchase equipment and vehicles based on lists of energy-efficient product specifications of different categories of equipment and vehicles to be drawn up by the authorities or agencies referred to in Article 4(4), using, where applicable, minimised life-cycle cost analysis or comparable methods to ensure cost-effectiveness; requirements to purchase equipment that has efficient energy consumption in all modes, including in standby mode, using, where applicable, minimised life-cycle cost analysis or comparable methods to ensure cost-effectiveness; requirements to replace or retrofit existing equipment and vehicles with the equipment listed in points (b) and (c); requirements to use energy audits and implement the resulting cost-effective recommendations; requirements to purchase or rent energy-efficient buildings or parts thereof, or requirements to replace or retrofit purchased or rented buildings or parts thereof in order to render them more energy-efficient.
← anx_V__point_6__text_1 · All articles · anx_VI__text_1 →
Source: EUR-Lex (Cellar) · retrieved 2026-10-29 · Text as adopted (Official Journal); later amendments are not incorporated in this text.