2.
Operators of the applications referred to in paragraph 1 shall ensure that they are checked for leakage by certified personnel who comply with the requirements of Article 5, according to the following schedule: applications containing 3 kg or more of fluorinated greenhouse gases shall be checked for leakage at least once every 12 months; this shall not apply to equipment with hermetically sealed systems, which are labelled as such and contain less than 6 kg of fluorinated greenhouse gases; applications containing 30 kg or more of fluorinated greenhouse gases shall be checked for leakage at least once every six months; applications containing 300 kg or more of fluorinated greenhouse gases shall be checked for leakage at least once every three months. The applications shall be checked for leakage within one month after a leak has been repaired to ensure that the repair has been effective. For the purposes of this paragraph, ‘checked for leakage’ means that the equipment or system is examined for leakage using direct or indirect measuring methods, focusing on those parts of the equipment or system most likely to leak. The direct and indirect measuring methods of checking for leakage shall be specified in the standard checking requirements referred to in paragraph 7.
← art_3__para_1__point_b__text_1 · All articles · art_3__para_2__text_1 →
Source: EUR-Lex (Cellar) · retrieved 2026-11-04 · Text as adopted (Official Journal); later amendments are not incorporated in this text.