anx_SUBSYSTEMS__cpt_3__text_1
The notified body responsible for ‘EC’ verification assesses the design and production of the subsystem and draws up the certificate of verification intended for the applicant, which in turn draws up the ‘EC’ declaration of verification intended for the supervisory authority in the Member State in which the subsystem is located and/or operates.
← 3. Certificate · All articles · anx_SUBSYSTEMS__cpt_3__text_2 →
Source: EUR-Lex (Cellar) · retrieved 2026-10-29 · Text as adopted (Official Journal); later amendments are not incorporated in this text.