2.
The task of the notified body responsible for the ‘EC’ verification of a subsystem shall begin at the design stage and cover the entire manufacturing period through to the acceptance stage before the subsystem is placed in service. It shall also cover verification of the interfaces of the subsystem in question with the system into which it is incorporated, based on the information available in the relevant TSI and in the registers provided for in Articles 34 and 35.