3.
Until such time as the extension of the scope of the TSIs to cover the whole of the rail network takes effect: authorisations for the placing in service of vehicles and on-board control-command and signalling subsystems to be used at least partially on the part of the network that does not yet fall within the scope of the TSIs, in respect of that part of the network, of infrastructure, energy and trackside control-command and signalling subsystems on the parts of the network that do not yet fall within the scope of the TSIs, shall be granted in accordance with the national rules referred to in Article 8 of Directive 2004/49/EC, or, where applicable, Article 17(3) of this Directive; authorisations for the placing in service of vehicles to be used occasionally on the part of the network that does not yet fall within the scope of the TSIs, in respect of that part of the network, shall be granted in accordance with Articles 21 to 27 and the national rules referred to in Article 8 of Directive 2004/49/EC, or, where applicable, Article 17(3) of this Directive.
← art_8__para_2__text_1 · All articles · art_8__para_3__text_1 →
Source: EUR-Lex (Cellar) · retrieved 2026-10-29 · Text as adopted (Official Journal); later amendments are not incorporated in this text.