lexiara

doc__table__1641

| 39 | Uncertainties surrounding the amount to be recognised as a provision are dealt with by various means according to the circumstances. Where the provision being measured involves a large population of items, the obligation is estimated by weighting all possible outcomes by their associated probabilities. The name for this statistical method of estimation is ‘expected value’. The provision will therefore be different depending on whether the probability of a loss of a given amount is, for example, 60 per cent or 90 per cent. Where there is a continuous range of possible outcomes, and each point in that range is as likely as any other, the mid-point of the range is used. Example An entity sells goods with a warranty under which customers are covered for the cost of repairs of any manufacturing defects that become apparent within the first six months after purchase. If minor defects were detected in all products sold, repair costs of 1 million would result. If major defects were detected in all products sold, repair costs of 4 million would result. The entity's past experience and future expectations indicate that, for the coming year, 75 per cent of the goods sold will have no defects, 20 per cent of the goods sold will have minor defects and 5 per cent of the goods sold will have major defects. In accordance with paragraph 24, an entity assesses the probability of an outflow for the warranty obligations as a whole. The expected value of the cost of repairs is: (75 % of nil) + (20 % of 1m) + (5 % of 4m) = 400 000

· All articles ·

Source: EUR-Lex (Cellar) · retrieved 2026-11-08 · Text as adopted (Official Journal); later amendments are not incorporated in this text.