lexiara

doc__table__2760

| B19 | In determining what a reasonably possible change in the relevant risk variable is, an entity should consider: (a) the economic environments in which it operates. A reasonably possible change should not include remote or ‘worst case’ scenarios or ‘stress tests’. Moreover, if the rate of change in the underlying risk variable is stable, the entity need not alter the chosen reasonably possible change in the risk variable. For example, assume that interest rates are 5 per cent and an entity determines that a fluctuation in interest rates of ± 50 basis points is reasonably possible. It would disclose the effect on profit or loss and equity if interest rates were to change to 4,5 per cent or 5,5 per cent. In the next period, interest rates have increased to 5,5 per cent. The entity continues to believe that interest rates may fluctuate by ± 50 basis points (i.e. that the rate of change in interest rates is stable). The entity would disclose the effect on profit or loss and equity if interest rates were to change to 5 per cent or 6 per cent. The entity would not be required to revise its assessment that interest rates might reasonably fluctuate by ± 50 basis points, unless there is evidence that interest rates have become significantly more volatile; (b) the time frame over which it is making the assessment. The sensitivity analysis shall show the effects of changes that are considered to be reasonably possible over the period until the entity will next present these disclosures, which is usually its next annual reporting period.

· All articles ·

Source: EUR-Lex (Cellar) · retrieved 2026-11-08 · Text as adopted (Official Journal); later amendments are not incorporated in this text.