lexiara

art_13__point_2__text_1

When, after an inspection referred to in point 1, deficiencies to be rectified at the next port of call have been recorded in the inspection database, the competent authority of such next port may decide not to carry out the verifications referred to in point 1(a) and (c).

· All articles ·

Source: EUR-Lex (Cellar) · retrieved 2026-10-30 · Text as adopted (Official Journal); later amendments are not incorporated in this text.