3.
Member States may apply to the Commission, for the purposes of Article 5, for account to be taken of electricity from renewable energy sources produced and consumed in a third country, in the context of the construction of an interconnector with a very long lead-time between a Member State and a third country if the following conditions are met: construction of the interconnector started by 31 December 2016; it is not possible for the interconnector to become operational by 31 December 2020; it is possible for the interconnector to become operational by 31 December 2022; after it becomes operational, the interconnector will be used for the export to the Community, in accordance with paragraph 2, of electricity generated from renewable energy sources; the application relates to a joint project that fulfils the criteria in points (b) and (c) of paragraph 2 and that will use the interconnector after it becomes operational, and to a quantity of electricity that is no greater than the quantity that will be exported to the Community after the interconnector becomes operational.
← art_9__para_2__point_c__text_1 · All articles · art_9__para_3__text_1 →
Source: EUR-Lex (Cellar) · retrieved 2026-10-28 · Text as adopted (Official Journal); later amendments are not incorporated in this text.