(61) In certain circumstances it is not possible fully to ensure transmission and distribution of electricity produced from renewable energy sources without affecting the reliability or safety of the grid system. In such circumstances it may be appropriate for financial compensation to be given to those producers. Nevertheless, the objectives of this Directive require a sustained increase in the transmission and distribution of electricity produced from renewable energy sources without affecting the reliability or safety of the grid system. To this end, Member States should take appropriate measures in order to allow a higher penetration of electricity from renewable energy sources, inter alia, by taking into account the specificities of variable resources and resources which are not yet storable. To the extent required by the objectives set out in this Directive, the connection of new renewable energy installations should be allowed as soon as possible. In order to accelerate grid connection procedures, Member States may provide for priority connection or reserved connection capacities for new installations producing electricity from renewable energy sources.
2 national measures recorded under this provision, in 1 form — sign in to view the analysis.
← rec_60 · All articles · rec_62 →
Source: EUR-Lex (Cellar) · retrieved 2026-10-28 · Text as adopted (Official Journal); later amendments are not incorporated in this text.