3.
Where the competent authority is satisfied that the conditions referred to in points (a) and (b) of paragraph 1 are met, it shall prepare a draft decision of approval of the transfer of responsibility. The draft decision shall specify the method for determining that the conditions referred to in paragraph 1(d) have been met as well as any updated requirements for the sealing of the storage site and for the removal of injection facilities. If the competent authority considers that the conditions referred to in points (a) and (b) of paragraph 1 are not met, it shall inform the operator of its reasons.