lexiara

CLASS B, C AND D SHIPS CONRUCTED ON OR AFTER 1 JANUARY 2003:

Location and arrangement of vent pipes for fuel oil service, settling and lubricating oil tanks shall be such that in the event of a broken vent pipe this shall not directly lead to the risk of ingress of seawater splashes or rainwater. Two fuel oil service tanks for each type of fuel used on board necessary for propulsion and vital systems or equivalent arrangements shall be provided on each ship, with a capacity of at least 8 hours for class B ships and at least 4 hours for class C and D ships, at maximum continuous rating of the propulsion plant and normal operating load at sea of the generator plant.

· All articles ·

Source: EUR-Lex (Cellar) · retrieved 2026-11-10 · Text as adopted (Official Journal); later amendments are not incorporated in this text.