.3 REQUIREMENTS APPLICABLE TO NEW CLASS B, C AND D RO-RO PASSENGER SHIPS CONSTRUCTED ON OR AFTER 1 JULY 1999
For new class B, C and D ro-ro passenger ships constructed on or after 1 July 1999, escape routes shall be evaluated by an evacuation analysis early in the design process. The analysis shall be used to identify and eliminate, as far as practicable, congestion which may develop during an abandonment, due to normal movement of passengers and crew along escape routes, including the possibility that crew may need to move along these routes in a direction opposite the movement of the passengers. In addition, the analysis shall be used to demonstrate that escape arrangements are sufficiently flexible to provide for the possibility that certain escape routes, assembly stations, embarkation stations or survival craft may not be available as a result of a casualty.
← anx_I__cpt_1__cpt_3__cpt_2__cpt_7__cpt_2__item_3__text_1 · All articles · anx_I__cpt_1__cpt_3__cpt_2__cpt_7__cpt_3__text_1 →
Source: EUR-Lex (Cellar) · retrieved 2026-11-10 · Text as adopted (Official Journal); later amendments are not incorporated in this text.