lexiara

10 Rescue boat embarkation, launching and recovery arrangements (R 17)

.1 The rescue boat embarkation and launching arrangements shall be such that the rescue boat can be boarded and launched in the shortest possible time. .2 The rescue boat shall be capable of being boarded and launched directly from the stowed position with the number of persons assigned to crew the rescue boat on board. .3 If the rescue boat is included in the capacity of the survival craft and the other lifeboats are boarded from the embarkation deck the rescue boat shall, in addition to paragraph .2, also be capable of being boarded from the embarkation deck. .4 Launching arrangements shall comply with the requirements of Regulation 9. However all rescue boats shall be capable of being launched, where necessary utilising painters, with the ship making headway at speeds up to 5 knots in calm water. .5 Recovery time of the rescue boat shall be not more than 5 minutes in moderate sea conditions when loaded with its full complement of persons and equipment. If the rescue boat is included in the capacity of the survival craft, this recovery time shall be possible when loaded with its survival craft equipment and the approved rescue boat complement of at least 6 persons. Rescue boat embarkation and recovery arrangements shall allow for safe and efficient handling of a stretcher case. Foul weather recovery strops shall be provided for safety if heavy fall blocks constitute a danger.

· All articles ·

Source: EUR-Lex (Cellar) · retrieved 2026-11-10 · Text as adopted (Official Journal); later amendments are not incorporated in this text.