1.
Without prejudice to the supply of electricity on the basis of contractual obligations, including those which derive from the tendering specifications, the transmission system operator shall, where it has such a function, be responsible for dispatching the generating installations in its area and for determining the use of interconnectors with other systems.
← Article 15 · All articles · art_15__para_1__text_1 →
Source: EUR-Lex (Cellar) · retrieved 2026-10-28 · Text as adopted (Official Journal); later amendments are not incorporated in this text.