3.
Member States shall ensure that any existing service station with a throughput in excess of 3000 m^(3)/year shall be equipped with a Stage II petrol vapour recovery system by no later than 31 December 2018.
← art_3__para_2__point_b__text_1 · All articles · art_3__para_3__text_1 →
Source: EUR-Lex (Cellar) · retrieved 2026-11-26 · Text as adopted (Official Journal); later amendments are not incorporated in this text.