lexiara

4. INTERNAL MARKET

As regards Regulation (EC) No 2195/2002, the Commission should be empowered in particular to update the structure and codes of the CPV and to make technical adjustments to any of the Annexes to that Regulation in order to provide users with a tool adapted to their needs and to developments in the market. Since those measures are of general scope and are designed to amend non-essential elements of Regulation (EC) No 2195/2002, they must be adopted in accordance with the regulatory procedure with scrutiny provided for in Article 5a of Decision 1999/468/EC. When, on imperative grounds of urgency, the normal time-limits for the regulatory procedure with scrutiny cannot be complied with, the Commission should be able to have recourse to the urgency procedure provided for in Article 5a(6) of Decision 1999/468/EC for the adoption of amendments of a purely technical nature. Accordingly, Articles 2 and 3 of Regulation (EC) No 2195/2002 shall be replaced by the following: ‘Article 2 The Commission shall adopt the measures necessary for the revision of the CPV. Those measures, designed to amend non-essential elements of this Regulation, shall be adopted in accordance with the regulatory procedure with scrutiny referred to in Article 3(2). On imperative grounds of urgency, the Commission may have recourse to the urgency procedure referred to in Article 3(3). Article 3 1. The Commission shall be assisted by the Committee established by Council Decision 71/306/EEC OJ L 185, 16.8.1971, p. 15.’. . 2. Where reference is made to this paragraph, Article 5a(1) to (4) and Article 7 of Decision 1999/468/EC shall apply, having regard to the provisions of Article 8 thereof. 3. Where reference is made to this paragraph, Article 5a(1), (2), (4) and (6) and Article 7 of Decision 1999/468/EC shall apply, having regard to the provisions of Article 8 thereof. As regards Directive 2004/17/EC, the Commission should be empowered in particular to make technical adjustments to certain provisions of the Directive and its Annexes, in line with technical progress or developments in Member States, and to revise the thresholds for application of the arrangements. Since those measures are of general scope and are designed to amend non-essential elements of Directive 2004/17/EC, they must be adopted in accordance with the regulatory procedure with scrutiny provided for in Article 5a of Decision 1999/468/EC. On grounds of efficiency and because of the time-limits imposed by the procedures laid down for calculation and publication, the normal time-limits for the regulatory procedure with scrutiny should be curtailed for the revision of certain thresholds. When, on imperative grounds of urgency, the normal time-limits for the regulatory procedure with scrutiny cannot be complied with, the Commission should be able to have recourse to the urgency procedure provided for in Article 5a(6) of Decision 1999/468/EC for the adoption of amendments of a purely technical nature. Accordingly, Directive 2004/17/EC is hereby amended as follows: Article 68 shall be replaced by the following: ‘Article 68 Committee procedure 1. The Commission shall be assisted by the Committee established by Council Decision 71/306/EEC OJ L 185, 16.8.1971, p. 15.’; . 2. Where reference is made to this paragraph, Articles 3 and 7 of Decision 1999/468/EC shall apply, having regard to the provisions of Article 8 thereof. 3. Where reference is made to this paragraph, Article 5a(1) to (4) and Article 7 of Decision 1999/468/EC shall apply, having regard to the provisions of Article 8 thereof. 4. Where reference is made to this paragraph, Article 5a(1) to (4) and (5)(b) and Article 7 of Decision 1999/468/EC shall apply, having regard to the provisions of Article 8 thereof. The time-limits laid down in Article 5a(3)(c), (4)(b) and (4)(e) of Decision 1999/468/EC shall be set at four, two and six weeks respectively. 5. Where reference is made to this paragraph, Article 5a(1), (2), (4) and (6) and Article 7 of Decision 1999/468/EC shall apply, having regard to the provisions of Article 8 thereof. Article 69 shall be amended as follows: the first subparagraph of paragraph 1 shall be replaced by the following: ‘The Commission shall verify the thresholds established in Article 16 every two years from 30 April 2004, and shall, if necessary, with regard to the second subparagraph, revise them. Those measures, designed to amend non-essential elements of this Directive, shall be adopted in accordance with the regulatory procedure with scrutiny referred to in Article 68(4). On imperative grounds of urgency, the Commission may have recourse to the urgency procedure referred to in Article 68(5).’; the first subparagraph of paragraph 2 shall be replaced by the following: ‘At the same time as performing the revision under paragraph 1, the Commission shall align the thresholds laid down in Article 61 (design contests) with the revised threshold applicable to service contracts. Those measures, designed to amend non-essential elements of this Directive, shall be adopted in accordance with the regulatory procedure with scrutiny referred to in Article 68(4). On imperative grounds of urgency, the Commission may have recourse to the urgency procedure referred to in Article 68(5).’; Article 70 shall be replaced by the following: ‘Article 70 Amendments 1. The Commission may amend, in accordance with the advisory procedure referred to in Article 68(2): (a) the procedure for sending and publishing data referred to in Annex XX, on grounds of technical progress or for administrative reasons; (b) the procedures for the drawing-up, transmission, receipt, translation, collection and distribution of the notices referred to in Articles 41, 42, 43 and 63; (c) in the interests of administrative simplification as provided for in Article 67(3), the procedures for the use, drawing-up, transmission, receipt, translation, collection and distribution of the statistical reports referred to in Article 67(1) and (2). 2. The Commission may amend the following: (a) the list of contracting entities in Annexes I to X so that they fulfil the criteria set out in Articles 2 to 7; (b) the procedures for specific references to particular positions in the CPV nomenclature in the notices; (c) the reference numbers in the nomenclature set out in Annex XVII, in so far as this does not change the material scope of the Directive, and the procedures for reference in the notices to particular positions in that nomenclature within the categories of services listed in the Annex; (d) the reference numbers in the nomenclature set out in Annex XII, insofar as this does not change the material scope of the Directive, and the procedures for reference to particular positions of that nomenclature in the notices; (e) Annex XI; (f) the technical details and characteristics of the devices for electronic receipt referred to in points (a), (f) and (g) of Annex XXIV; (g) the technical procedures for the calculation methods set out in the second subparagraph of Article 69(1) and the second subparagraph of Article 69(2). Those measures, designed to amend non-essential elements of this Directive, shall be adopted in accordance with the regulatory procedure with scrutiny referred to in Article 68(3). On imperative grounds of urgency, the Commission may have recourse to the urgency procedure referred to in Article 68(5).’. As regards Directive 2004/18/EC, the Commission should be empowered in particular to make technical adjustments to certain provisions of the Directive and its Annexes, in line with technical progress or developments in Member States, and to revise the thresholds for application of the arrangements. Since those measures are of general scope and are designed to amend non-essential elements of Directive 2004/18/EC, they must be adopted in accordance with the regulatory procedure with scrutiny provided for in Article 5a of Decision 1999/468/EC. On grounds of efficiency and because of the time-limits imposed by the procedures laid down for calculation and publication, the normal time-limits for the regulatory procedure with scrutiny should be curtailed for the revision of certain thresholds. When, on imperative grounds of urgency, the normal time-limits for the regulatory procedure with scrutiny cannot be complied with, the Commission should be able to have recourse to the urgency procedure provided for in Article 5a(6) of Decision 1999/468/EC for the adoption of amendments of a purely technical nature. Accordingly, Directive 2004/18/EC is hereby amended as follows: Article 77 shall be replaced by the following: ‘Article 77 Committee procedure 1. The Commission shall be assisted by the Committee established by Council Decision 71/306/EEC OJ L 185, 16.8.1971, p. 15.’; . 2. Where reference is made to this paragraph, Articles 3 and 7 of Decision 1999/468/EC shall apply, having regard to the provisions of Article 8 thereof. 3. Where reference is made to this paragraph, Article 5a(1) to (4) and Article 7 of Decision 1999/468/EC shall apply, having regard to the provisions of Article 8 thereof. 4. Where reference is made to this paragraph, Article 5a(1) to (4) and (5)(b) and Article 7 of Decision 1999/468/EC shall apply, having regard to the provisions of Article 8 thereof. The time-limits laid down in Article 5a(3)(c), (4)(b) and (4)(e) of Decision 1999/468/EC shall be set at four, two and six weeks respectively. 5. Where reference is made to this paragraph, Article 5a(1), (2), (4) and (6) and Article 7 of Decision 1999/468/EC shall apply, having regard to the provisions of Article 8 thereof. Article 78 shall be amended as follows: the first subparagraph of paragraph 1 shall be replaced by the following: ‘The Commission shall verify the thresholds established in Article 7 every two years from 30 April 2004 and shall, if necessary, revise them. Those measures, designed to amend non-essential elements of this Directive, shall be adopted in accordance with the regulatory procedure with scrutiny referred to in Article 77(4). On imperative grounds of urgency, the Commission may have recourse to the urgency procedure referred to in Article 77(5).’; paragraph 2 shall be replaced by the following: ‘2. At the same time as the revision under paragraph 1, the Commission shall align: (a) the thresholds established in point (a) of the first paragraph of Article 8, in Article 56 and in the first subparagraph of Article 63(1) on the revised threshold applying to public works contracts; (b) the threshold established in Article 67(1)(a) on the revised threshold applying to public service contracts awarded by the contracting authorities referred to in Annex IV; (c) the thresholds established in point (b) of the first paragraph of Article 8 and in Article 67(1)(b) and (c) on the revised threshold applying to public service contracts awarded by contracting authorities other than those referred to in Annex IV. Those measures, designed to amend non-essential elements of this Directive, shall be adopted in accordance with the regulatory procedure with scrutiny referred to in Article 77(4). On imperative grounds of urgency, the Commission may have recourse to the urgency procedure referred to in Article 77(5).’; Article 79 shall be replaced by the following: ‘Article 79 Amendments 1. The Commission may amend, in accordance with the advisory procedure referred to in Article 77(2): (a) the procedures for the drawing-up, transmission, receipt, translation, collection and distribution of the notices referred to in Articles 35, 58, 64 and 69 and the statistical reports provided for in the fourth subparagraph of Article 35(4) and in Articles 75 and 76; (b) the procedure for sending and publishing data referred to in Annex VIII, on grounds of technical progress or for administrative reasons. 2. The Commission may amend the following: (a) the technical procedures for the calculation methods set out in the second subparagraph of Article 78(1) and in Article 78(3); (b) the procedures for specific reference to specific positions in the CPV nomenclature in the notices; (c) the lists of bodies and categories of bodies governed by public law in Annex III, when, on the basis of the notifications from the Member States, such amendment proves necessary; (d) the lists of central government authorities in Annex IV, following the adaptations necessary to give effect to the Agreement; (e) the reference numbers in the nomenclature set out in Annex I, in so far as this does not change the material scope of this Directive, and the procedures for reference to particular positions of that nomenclature in the notices; (f) the reference numbers in the nomenclature set out in Annex II, in so far as this does not change the material scope of this Directive, and the procedures for reference in the notices to particular positions in that nomenclature within the categories of services listed in the Annex; (g) the technical details and characteristics of the devices for electronic receipt referred to in points (a), (f) and (g) of Annex X. Those measures, designed to amend non-essential elements of this Directive, shall be adopted in accordance with the regulatory procedure with scrutiny referred to in Article 77(3). On imperative grounds of urgency, the Commission may have recourse to the urgency procedure referred to in Article 77(5).’.

· All articles ·

Source: EUR-Lex (Cellar) · retrieved 2026-10-21 · Text as adopted (Official Journal); later amendments are not incorporated in this text.