4. Timetable for market operations
4.1. The allocation of the available transmission capacity shall take place sufficiently in advance. Prior to each allocation, the involved TSOs shall, jointly, publish the capacity to be allocated, taking into account where appropriate the capacity released from any firm transmission rights and, where relevant, associated netted nominations, along with any time periods during which the capacity will be reduced or not available (for the purpose of maintenance, for example). 4.2. Having full regard to network security, the nomination of transmission rights shall take place sufficiently in advance, before the day-ahead sessions of all the relevant organised markets and before the publication of the capacity to be allocated under the day-ahead or intra-day allocation mechanism. Nominations of transmission rights in the opposite direction shall be netted in order to make efficient use of the interconnection. 4.3. Successive intra-day allocations of available transmission capacity for day D shall take place on days D-1 and D, after the issuing of the indicated or actual day-ahead production schedules. 4.4. When preparing day-ahead network operation, the TSOs shall exchange information with neighbouring TSOs, including their forecast network topology, the availability and forecasted production of generation units, and load flows in order to optimise the use of the overall network through operational measures in compliance with the rules for secure network operation.
← anx_I__cpt_3__cpt_6__text_2 · All articles · anx_I__cpt_4__cpt_1 →
Source: EUR-Lex (Cellar) · retrieved 2026-10-29 · Text as adopted (Official Journal); later amendments are not incorporated in this text.