5. Transparency
5.1. TSOs shall publish all relevant data related to network availability, network access and network use, including a report on where and why congestion exists, the methods applied for managing the congestion and the plans for its future management. 5.2. TSOs shall publish a general description of the congestion-management method applied under different circumstances for maximising the capacity available to the market, and a general scheme for the calculation of the interconnection capacity for the different timeframes, based upon the electrical and physical realities of the network. Such a scheme shall be subject to review by the regulatory authorities of the Member States concerned. 5.3. The congestion management and capacity-allocation procedures in use, together with the times and procedures for applying for capacity, a description of the products offered and the obligations and rights of both the TSOs and the party obtaining the capacity, including the liabilities that accrue upon failure to honour obligations, shall be described in detail and made available in a transparent manner to all potential network users by TSOs. 5.4. The operational and planning security standards shall form an integral part of the information that TSOs publish in an open and public document. That document shall also be subject to review of the national regulatory authorities. 5.5. TSOs shall publish all relevant data concerning cross-border trade on the basis of the best possible forecast. In order to fulfil that obligation the market participants concerned shall provide the TSOs with the relevant data. The manner in which such information is published shall be subject to review by the regulatory authorities. TSOs shall publish at least: annually: information on the long-term evolution of the transmission infrastructure and its impact on cross-border transmission capacity; monthly: month- and year-ahead forecasts of the transmission capacity available to the market, taking into account all relevant information available to the TSO at the time of the forecast calculation (for example, impact of summer and winter seasons on the capacity of lines, maintenance of the network, availability of production units, etc.); weekly: week-ahead forecasts of the transmission capacity available to the market, taking into account all relevant information available to the TSOs at the time of calculation of the forecast, such as the weather forecast, planned network maintenance work, availability of production units, etc.; daily: day-ahead and intra-day transmission capacity available to the market for each market time unit, taking into account all netted day-ahead nominations, day-ahead production schedules, demand forecasts and planned network maintenance work; total capacity already allocated, by market time unit, and all relevant conditions under which that capacity may be used (for example, auction clearing price, obligations on how to use the capacity, etc.), so as to identify any remaining capacity; allocated capacity as soon as possible after each allocation, as well as an indication of prices paid; total capacity used, by market time unit, immediately after nomination; as closely as possible to real time: aggregated realised commercial and physical flows, by market time unit, including a description of the effects of any corrective actions taken by the TSOs (such as curtailment) for solving network or system problems; ex-ante information on planned outages and ex-post information for the previous day on planned and unplanned outages of generation units larger than 100 MW. 5.6. All relevant information shall be available for the market in due time for the negotiation of all transactions (such as the time of negotiation of annual supply contracts for industrial customers or the time when bids have to be sent into organised markets). 5.7. The TSO shall publish the relevant information on forecast demand and on generation according to the timeframes referred to in points 5.5 and 5.6. The TSO shall also publish the relevant information necessary for the cross-border balancing market. 5.8. When forecasts are published, the ex post realised values for the forecast information shall also be published in the time period following that to which the forecast applies or at the latest on the following day (D + 1). 5.9. All information published by the TSOs shall be made freely available in an easily accessible form. All data shall also be accessible through adequate and standardised means of information exchange, to be defined in close cooperation with market participants. The data shall include information on past time periods with a minimum of two years, so that new market entrants may also have access to such data. 5.10. TSOs shall exchange regularly a set of sufficiently accurate network and load flow data in order to enable load flow calculations for each TSO in their relevant area. The same set of data shall be made available to the regulatory authorities and to the Commission upon request. The regulatory authorities and the Commission shall ensure the confidential treatment of that set of data, by themselves and by any consultant carrying out analytical work for them on the basis of those data.
← anx_I__cpt_4__cpt_4__text_2 · All articles · anx_I__cpt_5__cpt_1 →
Source: EUR-Lex (Cellar) · retrieved 2026-10-29 · Text as adopted (Official Journal); later amendments are not incorporated in this text.