lexiara

3.2. Definition of all relevant points for transparency requirements

Relevant points shall include at least: all entry points to a network operated by a transmission system operator; the most important exit points and exit zones covering at least 50 % of total exit capacity of the network of a given transmission system operator, including all exit points or exit zones covering more than 2 % of total exit capacity of the network; all points connecting different networks of transmission system operators; all points connecting the network of a transmission system operator with an LNG terminal; all essential points within the network of a given transmission system operator including points connecting to gas hubs. All points are considered essential which, based on experience, are likely to experience physical congestion; all points connecting the network of a given transmission system operator to infrastructure necessary for providing ancillary services as defined by Article 2, point 14 of Directive 2009/73/EC.

· All articles ·

Source: EUR-Lex (Cellar) · retrieved 2026-10-29 · Text as adopted (Official Journal); later amendments are not incorporated in this text.