lexiara

Article 14a › 2

IED

The EMS shall include at least the following: (a) environmental policy objectives for the continuous improvement of the environmental performance and safety of the installation, which shall include measures to: (i) prevent the generation of waste; (ii) optimise resource and energy use and water reuse; (iii) prevent or reduce the use or emissions of hazardous substances; (b) objectives and performance indicators in relation to significant environmental aspects, which shall take into account benchmarks set out in the relevant BAT conclusions; (c) for installations covered by the obligation to conduct an energy audit or implement an energy management system pursuant to Article 8 of Directive 2012/27/EU, inclusion of the results of that audit or implementation of the energy management system pursuant to Article 8 of and Annex VI to that Directive and of the measures to implement their recommendations; (d) a chemicals inventory of the hazardous substances present in or emitted from the installation as such, as constituents of other substances or as part of mixtures, with special regard given to the substances fulfilling the criteria referred to in Article 57 of Regulation (EC) No 1907/2006 and substances addressed in restrictions referred to in Annex XVII to Regulation (EC) No 1907/2006, and a risk assessment of the impact of such substances on human health and the environment, as well as an analysis of the possibilities for substituting them with safer alternatives or reducing their use or emissions; (e) measures taken to achieve the environmental objectives and avoid risks for human health or the environment, including corrective and preventive measures where needed; (f) a transformation plan as referred to in Article 27d.

· All articles ·

Source: EUR-Lex CELLAR · retrieved 2026-08-09