(b)
IED
where available, existing information on soil and groundwater measurements that reflect the state at the time the report is drawn up or, alternatively, new soil and groundwater measurements having regard to the possibility of soil and groundwater contamination by those hazardous substances to be used, produced or released by the installation concerned.
← (a) · All articles · art_22__para_2__para →
Source: EUR-Lex CELLAR · retrieved 2026-08-09 · Text as consolidated on 2024-08-04; changes after this date are not shown.