Article 52 › 2
IED
The operator shall determine the mass of each type of waste, if possible according to the European Waste List established by Decision 2000/532/EC, prior to accepting the waste at the waste incineration plant or waste co-incineration plant.
← 1 · All articles · 3 →
Source: EUR-Lex CELLAR · retrieved 2026-08-09