Article 52 › 3
Prior to accepting hazardous waste at the waste incineration plant or waste co-incineration plant, the operator shall collect available information about the waste for the purpose of verifying compliance with the permit requirements specified in Article 45(2). That information shall cover the following: (a) all the administrative information on the generating process contained in the documents mentioned in paragraph 4(a); (b) the physical, and as far as practicable, chemical composition of the waste and all other information necessary to evaluate its suitability for the intended incineration process; (c) the hazardous characteristics of the waste, the substances with which it cannot be mixed, and the precautions to be taken in handling the waste.
← 2 · All articles · 4 →
Source: EUR-Lex CELLAR · retrieved 2026-08-09