(i)
points 9 and 10 are replaced by the following: ‘9. The credit institutions calculating their capital requirements in accordance with Article 75(b) and (c) shall disclose those requirements separately for each risk referred to in those provisions. In addition, the capital requirement for specific interest rate risk of securitisation positions shall be disclosed separately. 10. The following information shall be disclosed by each credit institution which calculates its capital requirements in accordance with Annex V to Directive 2006/49/EC: (a) for each sub-portfolio covered: (i) the characteristics of the models used; (ii) for the capital charges in accordance with points 5a and 5l of Annex V to Directive 2006/49/EC separately, the methodologies used and the risks measured through the use of an internal model including a description of the approach used by the credit institution to determine liquidity horizons, the methodologies used to achieve a capital assessment that is consistent with the required soundness standard and the approaches used in the validation of the model; (iii) a description of stress testing applied to the sub-portfolio; (iv) a description of the approaches used for back-testing and validating the accuracy and consistency of the internal models and modelling processes; (b) the scope of acceptance by the competent authority; (c) a description of the extent and methodologies for compliance with the requirements set out in Part B of Annex VII to Directive 2006/49/EC; (d) the highest, the lowest and the mean of the following: (i) the daily value-at-risk measures over the reporting period and as per the period end; (ii) the stressed value-at-risk measures over the reporting period and as per the period end; (iii) the capital charges in accordance with points 5a and 5l of Annex V to Directive 2006/49/EC separately over the reporting period and as per the period-end; (e) the amount of capital in accordance with points 5a and 5l of Annex V to Directive 2006/49/EC separately, together with the weighted average liquidity horizon for each sub-portfolio covered; (f) a comparison of the daily end-of-day value-at-risk measures to the one-day changes of the portfolio’s value by the end of the subsequent business day together with an analysis of any important overshooting during the reporting period.’;
← anx_I__point_5__point_b__text_1 · All articles · anx_I__point_5__point_b__point_i__text_1 →
Source: EUR-Lex (Cellar) · retrieved 2026-10-13 · Text as adopted (Official Journal); later amendments are not incorporated in this text.